How long does it take to install a 20'x 12' gravel driveway with a grid?     |      | 2-4 hours |  38%  |    | 4-6 hours |  23%  |    | One full day |  38%  |  	| 			 |        |            |     	Question: How long does it take to install a 20'x 12' gravel driveway with a grid?			Top Answer (38% of 21 votes): 		2-4 hours.			   
                                      Answer: 2-4 hours Explanation: Using the right equipment and professionals  |    | Duval paving llc |    Answer: One full day Explanation: 6-8 hours depending on location, driveway thickness, and soil type.  |    | DB Tractor Works |    Answer: One full day Explanation: Although in some cases we may be able to complete the work faster but we like to tell you that it will take a little bit longer so when we are done quicker it is not that we are rushing but we are just completing the job in a timely manner  |    | The Asphalt Company |     |    | ProMatcher |    Answer: 2-4 hours Explanation: Machine installed  |    | Elite Asphalt  LLC |    Answer: 4-6 hours Explanation: This job would be vary easy to complete in under one day with the right equipment  |    | Greener Touch Landscaping llc |   
                                 |